One Hundred and Eight Kilowatt Hours Covers a Long Shift
A 120 kWh cabinet holds 108 kWh of usable energy in six packs. It suits a site using 1,200 to 2,000 kWh a day with a 60 to 80 kW peak. It is the largest single unit in the range.
The 90% depth of discharge is what turns the nameplate into the figure above.
Six Packs in the Same Enclosure as the Small One
Each pack is 1P20S of 314 Ah LFP cells, and the cabinet carries six of them on one bus. The enclosure stays 1349 by 2100 by 990 mm across the range, so the footprint does not change with capacity.
What changes is mass: 1,303 kg against 1,025 kg on the 80 kWh unit. That moves the delivery plan and nothing else.
Sixty Kilowatts at Sixty-Six kVA Is the Ceiling
Output current peaks at 100 A on a 380 V board and the apparent power ceiling is 66 kVA. PV input scales to 120 kWp, twice the inverter rating.
The full-power MPPT window starts at 320 V, the highest in the range, so strings need more modules per tracker than on smaller models.
The Weight Sets the Delivery Plan
At 1,303 kg the cabinet needs a crane or a heavy forklift. The pad has to carry it, and the route from the gate has to take the load. It arrives at 30% state of charge or less.
Built for a Site With a Long Day
At full load the cabinet runs 1.8 hours on one charge, which covers a long peak rather than a short one. Cold stores and evening loads sit in this band.
When the profile needs more, up to ten units run in parallel for 600 kW and 4,800 kWh, with four cabinets on one DC bus.
Paperwork Travels With the Cabinet
The cabinet arrives with six packs, the BMS, the hybrid inverter, aerosol fire suppression and cooling. Pad, cable trench and earthing are yours, and documentation follows within 15 days of signature.
Certificates are CB IEC 62619, CB IEC 63056 and CEI 0-21. UL 9540 and NFPA 855 are not held, so a North American site needs another product. Warranty is 5 years on pack, inverter and cooling, 2 years on fire suppression, extendable to 10.
Questions about 120 kwh battery storage system
How long will it run at full load?
About 1.8 hours at 60 kW, which is the 108 kWh of usable energy divided by the output. At half load it runs about twice as long. Runtime follows what the site draws, so the load profile sets it rather than a fixed figure.
What if I need more than 120 kWh?
Add cabinets. Up to ten units run in parallel for 600 kW and 4,800 kWh, and DC expansion allows four on one battery bus. A site that starts with one unit grows into a small microgrid without replacing the first cabinet.
How much PV can I connect?
Up to 120 kWp on the 60 kW unit, twice the inverter rating. The array charges the battery first and clips at the inverter limit only when the battery is full and the load is low. Five MPPT inputs take 1,100 V.
Will it fit through a gate or over a curb?
The cabinet is 1349 by 2100 by 990 mm and weighs 1,303 kg. It travels on a trailer and comes off with a crane or a heavy forklift. Whether it clears a gate or a curb is a site check, done before the delivery date is agreed.
The Load Profile Decides the Runtime, Not the Rating.
Start with the form. Our sales team asks for a month of half-hourly data and the transformer rating. You get the hours the cabinet runs and the peak it removes.