CabESSLuminBlock H · C&I all-in-one hybrid ESS
Home / Hotel Battery Storage
Hotel · guest comfort through an outage

Hotel Battery Storage

A hotel loses more than lights in an outage. The lift stops between floors, the kitchen loses its refrigeration, and the air handling stops in a full building on a warm night.

The cabinet backs up the circuits that keep guests comfortable: the lift bank, kitchen refrigeration, corridor and lobby lighting, and the plant that handles air. It does this without an engine running below the windows.

under 10 ms transfer108 kWh usable22 kW per phase10 units in parallel
THE GUEST

Comfort Is the Product a Hotel Sells

Cabinets at the service yard of a hotel with a rooftop solar array and a staff trolley in the foreground
Cabinets at a hotel service yard under the roof array. The essential board carries lifts, kitchens and HVAC; everything else stays on the grid.

Yes, for the circuits a guest notices. The cabinet transfers the essential board in under 10 ms and runs it from 108 kWh usable with no engine running. Guest rooms on the board keep their lighting and their air through the outage.

An outage at 21:00 in a full hotel is a review, a refund and a call to the insurer. The same outage behind a cabinet is a note at reception and a letter the next morning.

The board is a commercial decision before it is an electrical one. Lifts, kitchen cold storage, corridor lighting and the air handling for occupied rooms carry the guest experience. Back-of-house laundry can wait.

THE BOARD

Lifts, Kitchen, Air and Light

CircuitWhy it is on the board
Lift bankA stopped lift is the call nobody forgets
Kitchen refrigerationStock and service the next morning
Corridor and lobby lightingSafe movement, no dark stairs
Air handling, occupied roomsSleep in a warm building
Reception and access controlCheck-in, keys, door locks

A lift motor takes a large step when it starts, and the cabinet covers 150% of its rating for 10 seconds to carry it. Two lifts starting together are checked at design, and the board is set so they do not.

Single-phase backup reaches 22 kW per phase, which covers lighting and socket circuits in guest rooms without a three-phase feed to each floor.

THE RUNTIME

Two Hours Covers the Usual Outage

The useful figure is the load on the board. 108 kWh covers 15 kW for 7.2 hours, 30 kW for 3.6 hours and 60 kW for 1.8 hours. The hotel's board figure decides which applies.

A property that puts lifts, refrigeration and corridor lighting on a 30 kW board gets through a three-hour outage. The air handling sits on a second cabinet. A property that wants the whole building live needs several cabinets or a generator.

Adding battery cabinets extends the hours without changing the power. Three extra battery cabinets take one system to 480 kWh, which turns a three-hour cover into a night.

THE QUIET

No Engine Below the Windows

A diesel set needs a stack, a fuel tank and a service contract, and it runs where the guests sleep. A cabinet has a cooling fan and nothing else, and it can stand in a service yard against a wall.

The cabinet is IP55 with the inverter at IP66 and stands outdoors at 1349 by 2100 mm. Planning permission usually treats it as plant rather than a building, and the site's own consent process decides that.

Where a generator already exists, the two work together. The cabinet carries the first hours in silence, and the generator takes over if the outage runs long.

THE BILL

The Same Cabinet Works on the Bill

Hotels have a demand peak in the morning and another in the evening, with a quiet afternoon between. The cabinet shaves those peaks and charges in the quiet hours, which is the demand-charge case in a different building.

The backup reserve is held back from the shaving logic, so the pack never empties itself on the tariff and then fails the guests. That setting is agreed at commissioning and stays in the controller.

CHECK

Terms That Cover a Ten-Year Asset

Certificates are CB IEC 62619, CB IEC 63056 and CEI 0-21. Warranty is 5 years on pack, inverter and cooling unit and 2 years on fire suppression. Cover starts 60 months after installation or 66 after shipment, extendable to 10.

Performance is 6,500 cycles or 10 years to 70% state of health at 25C, 0.5P and 90% depth of discharge. Spare parts sit in four regional depots: EU, South Africa, Pakistan and Brazil.

FAQ

Questions about hotel battery storage

Can it keep the lifts running?

Yes, if the lift bank is on the essential board and the cabinet's power rating covers the motor starts. Two lifts starting together set the rating, and the board can be set to stage them. A hydraulic lift and a traction lift draw differently, so the survey checks both.

How long will the hotel stay open?

For the hours the board needs at its load. 108 kWh covers 30 kW for 3.6 hours. A property that wants a full night adds up to three additional battery cabinets per system, reaching 480 kWh in total without adding power. Adding cabinets raises the hours and leaves the power where it is.

Will guests hear it?

There is no engine. The cabinet has a cooling fan and runs at low noise outdoors, so a service yard position keeps it out of earshot of guest rooms. A generator in the same yard is the loud option. The cabinet stands outdoors at 1349 by 2100 mm, so a service yard position keeps it clear of guest windows.

Does it help with the electricity bill?

It can shave the morning and evening demand peaks and charge in the quiet hours. The backup reserve is held back from that logic, so the pack is never spent on the tariff and then missing during an outage. The demand cap and the backup reserve are set together at commissioning.

The Board List for Your Property

Tell us the lifts, the kitchen load and which circuits guests notice. You get the runtime at your board, the cabinet count and the position plan, in writing.