CabESSLuminBlock H · C&I all-in-one hybrid ESS
Home / Resources
Documents · no forms, no gate

Resources

Three documents cover most of what a project needs before a proposal: the technical data, the quote comparison and the sizing arithmetic.

Each one opens as a page on this site. There is no download form and no email gate.

3 documents5 models covered8 scope lines6 sizing inputs
THE THREE

Three Documents, Three Questions

Resources collects the specification sheet, the installation and commissioning page, the certification list and the quote comparison sheet. Each item is a page on this site rather than a gated PDF, so it can be read, checked and cited. Start with the model page for the rating you are considering.

DocumentQuestion it answersWhere it opens
DatasheetWhat exactly is in the cabinet/products/
Quote checklistWhat a quote has to state/tools/bess-quote-comparison/
Sizing sheetHow many units and how many hours/tools/bess-sizing-sheet/
DATASHEET

The Datasheet Is the Model Page

Each of the five models has its own page: BES-H37.5X80, BES-H40X80, BES-H49.9X100, BES-H50X100 and BES-H60X120. Each carries the electrical data that matters at the switchgear: rated power, usable energy, current, MPPT window, dimensions and weight.

The range runs 37.5 to 60 kW and 80 to 120 kWh, with 15 power and energy pairings when power and energy are chosen separately; five are stocked as standard models. Start from the model that covers your peak, then check the energy.

For 208 and 220 V grids there is a separate low voltage line. Its datasheet is not interchangeable with the global one, so ask for it by name.

The same page carries the numbers a designer asks for later: 88% round-trip efficiency, IP55 enclosure, five MPPT inputs, and a 10 ms transfer to backup.

CHECKLIST

The Checklist Makes Two Quotes Comparable

Eight lines, one column per supplier, three marks per line. Cabinet contents, separately bought items, transport and hoisting, site works, commissioning and documents, warranty start and cover, service and spares, data link.

Fill it in before reading the totals. Most of the difference between two quotes lands on three or four of those lines, and the cheapest quote is often the one with the most gaps.

SIZING

The Sizing Sheet Is Arithmetic You Can Check

Six inputs and five steps, with a worked table. It returns a model, a unit count and whether battery cabinets are needed.

It is deliberately simple. Temperature, altitude and corrosion class are not in it, because those are survey questions rather than desk questions.

If the sheet and the datasheet disagree, the datasheet wins. The sheet is a method, and the model page is the tested figure.

TOGETHER

Use Them in This Order

Sizing sheet first, to get a model and a count. Datasheet second, to check that the model fits the switchgear and the array. Checklist third, once quotes arrive.

The order matters. Comparing quotes before the sizing is settled means comparing two different machines, which is how a project ends up buying less power than it needs.

FAQ

Questions about resources

Are these PDFs?

No. Each one opens as a page you can print from the browser.

Can I get the datasheet by email?

Yes, on request. The model page already carries the figures, so an email copy adds the revision date and the signature.

Is there a technical manual?

The installation and user manuals ship with the unit within 15 days of signature, and the installation page summarises the site requirements.

Start With the Model That Fits

The model pages carry the figures; the checklist and the sizing sheet cover the rest. If a number is missing, ask and we will name the document it lives in.