Four Stages, One Growth Path
Up to ten cabinets run in parallel for 600 kW and 4.8 MWh. One unit is master and the rest are slaves with a unique gateway IP each; termination resistors are fitted only at the two ends of the communication chain. A single cabinet accepts up to three additional battery cabinets, for 480 kWh in total.
Start with the smallest thing that covers the load, then add capacity where it is cheapest.
| Stage | What is added | Result |
|---|---|---|
| 1 | One 60 kW / 120 kWh cabinet | 108 kWh usable, 1.8 h at full power |
| 2 | Three battery cabinets BHF-X120D | 480 kWh, 8 h at 60 kW |
| 3 | Second and further LuminBlock H units | AC side parallel operation |
| 4 | Ten units | 600 kW and 4,800 kWh |
4,800 kWh is 480 kWh multiplied by ten. It is the same arithmetic on the parallel side.
Battery Cabinets Add Hours, Not Kilowatts
A battery cabinet shares the inverter of the main unit. The power rating stays where it was and the runtime grows, which suits sites whose peak is already covered and whose outage window is the problem.
The ceiling is four cabinets per system. Clearance between battery cabinets is 600 mm, and the expansion cable is 35 mm² with a CAT5 for communication.
Parallel Units Add Kilowatts and Hours
Past 480 kWh the design moves to the AC side. Each unit keeps its own inverter, and the group shares load through a controller.
| Item | Purpose |
|---|---|
| iEMS controller | HXEM100 indoors, HXEM2000.R100 outdoor box |
| DTSU208 meter | Measures the point of common coupling |
| Current transformers | 400 to 2,500 A : 5 A, chosen by incoming current |
| Parallel switch | Isolates one unit without the group |
| Commissioning laptop | Sets addresses and reads each unit |
Each unit needs its own protective earth. A shared earth conductor is the most common cause of a parallel group that trips on start-up.
Two Switches Decide the Group
Units talk over shielded PARALLEL1 and PARALLEL2 links, daisy chained from one cabinet to the next. Termination is set by SW3, and it is on only at the two ends of the chain, never in the middle.
Position 1 terminates the RS485 pair at 120 Ω. Position 2 terminates the CAN pair at 120 Ω. A group with terminators in the wrong place behaves like a wiring fault, so check SW3 before replacing anything.
Off-Grid Loads Have Ratios
In island mode the group carries a share of its rated power, and the share depends on the load type. General loads run up to two thirds of rating. Transformer-fed loads run to one half. Half-wave rectifier loads run to one twentieth.
A generator on site needs a dry contact and a rating above the backup load, so the two sources do not fight each other on start-up.
Four Settings Turn a Group On
- Enable parallel mode On each unit, before any load is connected.
- Set master and slave One master, the rest follow it.
- Enter the parallel amount The actual number of units on site, not the planned number.
- Give each unit a unique gateway address Laptop at 192.168.100.100 with mask 255.255.252.0, iEMS web page at 192.168.100.80.
Alarms 175, 176 and 524 point at the parallel wiring and the termination switches. Check those before ordering parts.
Questions about parallel and expansion
Expansion or parallel first?
Expansion, up to 480 kWh per system. It reuses the inverter, so it costs less per added kilowatt-hour.
Can I mix models in one group?
Units in a parallel group should match in rating. Mixing a 37.5 kW cabinet with a 60 kW unit makes load sharing uneven.
How much space does a ten-unit group need?
One metre between units plus the clearances at each end. Plan the row before the first cabinet arrives, not after.
What if one unit fails?
The parallel switch isolates it and the group keeps running on the rest. Fault 175 or 176 tells you which unit dropped.
How many units can run in parallel, and how are they commissioned?
Up to ten units on one AC bus, reaching 600 kW and 4.8 MWh at the top end. One unit is master and the rest are slaves; set the parallel amount on each unit and give every unit a unique gateway IP. Switch the termination resistor on only at the first and last unit in the chain, and run communication on the PARALLEL1/PARALLEL2 ports over shielded cable.
Plan the Whole Path Before the First Cabinet
Start with the form. Our sales team asks for the load today and the load you expect in five years. The reply shows where expansion stops and parallel units start.