Size Power First, Energy Second
Pick the power rating from your highest sustained load in kW, then pick the energy from how many hours that load has to run without the grid. Usable energy is 90% of nameplate, so a 120 kWh cabinet holds 108 kWh, and duration is usable energy divided by load.
The cabinet covers 37.5 to 60 kW in one unit. If the peak is above that, two units in parallel do the same job without a second design.
Three Ways to Reach the Energy Figure
| Method | How it works | Best for |
|---|---|---|
| Daily energy | Shiftable kWh ≈ daily kWh × the share that falls in the peak window | Solar shifting, time-of-use tariffs |
| Demand shave | kWh ≈ peak kW × hours you want to cap | Demand charges, short peaks |
| PV ratio | PV stays at or below 200% of cabinet rating | New builds with panels |
Oversizing the PV array does not add storage. It adds clipping, because the cabinet can only accept what its MPPT inputs allow.
Three Loads, Three Answers
Each row takes a two-hour backup window. The energy column is what the site needs; the cabinet column is what covers it with margin.
| Load | Energy needed | Cabinet | Delivered window |
|---|---|---|---|
| 15 kW | 30 kWh | BES-H37.5X80 | 4.8 h at 15 kW |
| 30 kW | 60 kWh | BES-H40X80 | 2.4 h at 30 kW |
| 60 kW | 120 kWh | BES-H60X120 plus one battery cabinet | 3.6 h at 60 kW |
The first two land inside one cabinet because the energy is small relative to the rating. The third does not: 60 kW from a single cabinet runs 1.8 hours on 108 kWh, so a second battery cabinet is what buys the extra window.
Four Sites and What They Usually Choose
| Site | Load pattern | Typical choice |
|---|---|---|
| Cold store | Flat load, high demand charge | BES-H60X120, demand shave |
| Hotel | Evening peak, backup for essentials | BES-H50X100 with partial backup |
| Factory | Two shifts, motor starts | BES-H60X120, 150% for 10 s |
| EV charging | Short high peaks | BES-H60X120 plus cabinets as stalls grow |
These are starting points. The bills and the survey move the answer, and a site engineer usually moves it again.
Know Where a Single System Stops
One cabinet holds 120 kWh. Three battery cabinets take the same system to 480 kWh, which is eight hours at 60 kW.
Past that, units run in parallel. The ceiling is ten units, which is 600 kW and 4,800 kWh. Above 480 kWh per system the design changes from expansion to parallelism, and the commissioning steps change with it.
Questions about commercial battery storage sizing
80 kWh or 120 kWh?
Take the 120 kWh when the peak is near 60 kW or the backup window passes two hours. Otherwise the 80 kWh cabinet leaves budget for the switchgear.
How much energy for backup only?
Usable energy divided by the load you back up. A 25 kW essential load runs about 2.9 hours on 72 kWh.
Two small units or one big one?
Two units at 50 kW cover 100 kW and keep redundancy. One 60 kW unit is simpler and cheaper until the load passes 60 kW.
Check Your Number Against the Cabinet Range
Start with the form. Our sales team asks for the peak load, the backup window and the monthly kWh. The reply shows which model covers it and where a second cabinet starts.