Choose First, Calculate Second
Work in this order: load and tariff, then capacity and power, then AC or DC coupling, then the grid and backup boundary, then safety and certification, then warranty and spares, then supplier checks. Doing the calculation first is the mistake that sends people back to the start.
Each step narrows the next one. A site that needs backup power has a different answer from a site that only shifts solar, even when the bills look identical.
Seven Steps and the Document Each One Produces
| Step | What to settle | Document to request |
|---|---|---|
| 1 Load and tariff | Peak kW, daily kWh, demand charge | One recent bill, a year if available |
| 2 Capacity and power | Hours of backup, kilowatts to carry | Sizing sheet with the arithmetic |
| 3 Coupling | New PV, existing PV, or AC retrofit | Single-line diagram |
| 4 Grid boundary | Export limit, backup circuits, changeover | Grid application notes |
| 5 Safety and certs | Which standards your market accepts | Certificate list with versions |
| 6 Warranty and spares | Term, start rule, depot distance | Warranty text and RMA route |
| 7 Supplier checks | Who builds it, who answers at night | Factory and reference list |
Five Mistakes That Cost the Most
| Mistake | What it looks like |
|---|---|
| Buying on price per kWh | Same energy, less power, then a second cabinet later |
| Confusing kW with kWh | A 100 kWh cabinet at 49.9 kW cannot carry a 60 kW peak |
| Ignoring the grid connection | A system larger than the export limit the utility allows |
| Skipping the site survey | No space for a 1349 x 2100 x 990 mm cabinet or its clearances |
| Never asking about spares | A failed fan becomes a three-week wait, not a phone call |
Decide Where the Battery Stops
Write down which circuits the battery backs up before anyone quotes. Whole-site backup needs a changeover big enough for the full load, and that switchgear often costs more than the cabinet.
A partial backup board is cheaper and covers the loads that matter: the cold room, the servers, the pumps. Waiting for decisions later is how projects stall between signature and commissioning.
Check the Answer, Not the Brochure
Ask who manufactures the cabinet and who holds the certificates. Ask which standards are held for your market, and which are not. A supplier who names the gaps is easier to trust than one who has none.
Then ask about the fourth year, not the first. Where is the nearest spare depot, how long does a part take to arrive, and who signs the commissioning report.
Questions about how to choose commercial battery storage
How many quotes should I get?
Three, all against the same scope sheet. Two quotes rarely show the difference between a missing line and a better price.
Should I use an EPC or buy direct?
An EPC carries the site work and the schedule. Buying direct works when you already have an electrical contractor you trust.
When do I need parallel units?
Above 60 kW of load or 120 kWh of storage. One cabinet covers 60 kW and 120 kWh; up to ten run in parallel to 600 kW.
Do I need a site survey first?
Before the final quote, yes. Clearances, foundation, cable route and ground conditions decide lines that no bill can show.
Your Site Address Comes First
We run the seven steps with you and mark the ones your data cannot answer yet, so the gaps are visible before anything is signed.