The Total Follows the Scope
A commercial battery quote is built from the site, then priced. Four inputs set it: the power rating that covers your peak, the usable energy that covers your outage, the scope you take from us, and the destination. Change one and the number moves.
The cabinet is one enclosure rated 37.5 to 60 kW with 80 to 120 kWh. What surrounds it decides most of the total.
No prices and no savings forecasts appear here. Both depend on your tariff and your site.
Three Inputs Come From Your Files
- One recent bill, a year if you have it, asked for after the form Monthly kWh, the billed maximum demand in kW, and the demand charge.
- The load shape What runs, for how long, and when. A plant peaking for 20 minutes a day and a hotel peaking every evening need different cabinets at the same kWh.
- The site constraints Transformer rating, voltage, space beside the switchgear, cable route, export limit.
What a Quote Is Made Of
| Line | What sits in it | What moves it |
|---|---|---|
| Cabinet | Inverter, LFP battery, BMS, fire suppression, cooling | Power and energy rating |
| Separately bought items | Metering, CTs, logging, communications | Incoming current, existing metering |
| Transport and packaging | Freight, export packing, insurance | Destination, container fill, crane |
| Site works (own line) | Foundation, AC cable, grid connection fees | Cable run, ground conditions, utility charges |
| Commissioning and documents | Test report, drawings, insurance pack | Test scope, site access, who signs |
The last two rows are the ones that move. A quote built only from row one is a hardware price, and you buy the rest separately.
Same 100 kWh, a Different Machine
Energy and power are chosen separately. The 80 kWh cabinet comes at 37.5 or 40 kW, the 100 kWh at 49.9 or 50 kW, the 120 kWh at 60 kW. Usable energy is 90% of nameplate, so the three hold 72, 90 and 108 kWh, and each runs about 1.8 hours at full rated power. What changes across the range is the load the cabinet can carry, not the hours it holds.
Two Quotes, One Scope
Walk eight lines with both documents open. Mark each one given, partial or missing before you compare the totals.
| Scope line | What to check in both |
|---|---|
| Cabinet contents | Model, SKU and pack count in writing |
| Separately bought items | Metering, CTs, logging named |
| Transport and hoisting | Freight and crane inside the price |
| Site works | Foundation, cable, grid fees on own lines |
| Commissioning | Test report, drawing, insurance pack |
| Warranty start and cover | Start rule, extension, exclusions |
| Service and spares | Response path, RMA route, depot |
| Data link | SIM cost and who pays it |
The quote that still answers every line is the one worth a second call.
A Cheaper Total Is Cheaper Somewhere
When two totals sit far apart, the difference is a smaller machine, a smaller scope, or a risk moved onto your side. A smaller machine shows up as less power at the same energy. A smaller scope shows up as freight, hoisting or commissioning leaving the price. A moved risk shows up in the warranty start, the spare-part freight or the annual data cost.
Request a quote with the site address and destination. The reply carries the scope broken out, the assumptions in writing, and a list of lines we could not price.
Solar Battery Storage Price: What Moves It
There is no single solar battery storage price per kWh, because the quote covers the array interface as well as the battery. Four things move it: the DC size and MPPT count on the array, whether the site may export at all, the cable run to the switchgear, and the commissioning scope. The cabinet is one line in that quote.
A solar-coupled quote is compared on the same lines as a standalone one: cabinet, meter and CTs, freight, site works, grid application, commissioning, warranty start. The array adds its own lines on top. If a supplier quotes one price for solar battery storage, ask which of those lines are inside it.
Questions about commercial battery storage cost
Why is there no list price?
The number depends on the site, and a list price would hide the lines that decide the difference between two suppliers.
What is usually left out?
Foundation and civil works, the AC cable to your switchgear, grid-connection fees and the data link.
Does a bigger cabinet cost less per kWh?
The ratio changes between projects, so we do not publish one. Usable energy is 90% of nameplate.
How is an extension priced?
Cover runs five years on pack, inverter and cooling, two years on fire suppression, ten years in total with the extension.
Can I install it myself?
Yes. The quote then covers cabinet, documents and commissioning support, and the nine-point checklist still has to be signed.
How fast is a quote?
We aim to reply within two working days of a complete enquiry. The bill and load data are asked for after the form, because the cabinet count comes from them. A partial enquiry gets the missing list back.
What does solar battery storage cost for a business?
We do not publish a list price. The number is built from the scope: enclosure, usable kWh, metering, transport, hoisting, installation, commissioning and documents. Send the site details and the quote comes back broken out line by line.
Is there a published solar battery storage price per kWh?
No. A solar battery storage price quoted per kWh does not break out its scope: metering, transport, hoisting, installation, commissioning and documents all sit outside the cells. We quote by scope, line by line, so two offers can be compared.
What is a business battery storage cost made of?
The equipment, the optional items (battery cabinets, iEMS controller, CTs), transport and hoisting, the site works and the commissioning documents. Business battery storage cost moves with the scope around the box more than with the cells inside it.
What does commercial solar battery cost look like next to a plain battery?
Commercial solar battery cost adds the PV side: array, mounting, and a larger inverter input. The battery line is similar; the solar line is not. Ask for the two scopes separately, or the comparison becomes a single number that hides what changed.
How is a solar battery storage price in the UK built?
A solar battery storage price uk quote is built from four blocks: the cabinet, the array interface, the site works, and the grid application. Installers price labour and commissioning separately again. Ask for the blocks as separate lines; a single figure hides which block moved when a second quote comes in lower.
A Quote You Can Line Up
Seven fields in the form. Our sales team then asks for one recent bill, the site address and the destination country. The reply carries the scope broken out and every assumption written down.