Home / Projects / 175 kW PV and 300 kWh Storage at an Educational Campus
Project · Spain · campus

175 kW PV and 300 kWh Storage at an Educational Campus

An educational campus in Spain now covers part of its daily electricity use with an on-site solar-storage plant. Seven 25 kW three-phase hybrid inverters, 175 kW in total, work with 300 kWh of battery storage across the campus: daytime generation for teaching buildings, surplus held for evening activity or grid outages.

The site's problems are typical of campuses and hotels: demand rises when classes start, events run after sunset, and an outage takes out lighting, IT and teaching equipment. This project uses a different product. See how an LuminBlock H project differs.

175 kW hybrid inverters300 kWh storage7 × 25 kW inverters5 × 60 kWh cabinets
The site

Daytime Teaching, Evening Events, Occasional Outages

Campus demand rises during teaching hours, when PV output is still varying. Evening classes and events continue after solar generation has ended. Grid interruptions disrupt lighting, IT systems and teaching equipment, and peak demand charges add to the annual electricity bill.

  • Load: daytime teaching blocks plus evening events.
  • Generation: PV, variable through teaching hours.
  • Risk: outages during lessons and exams.
The problem in the bill

Solar Peaks at Lunchtime, the Campus Peaks Later

Without storage, midday generation is exported at a low value while the campus buys power back in the evening. Peak demand charges are set by the busiest fifteen minutes, not the average day. And an outage stops teaching regardless of how much solar the roof is making.

Storage moves the midday surplus into the evening and into the outage, and trims the demand peak while it does it.

What was built

Conversion Spread Across Buildings

Seven 25 kW three-phase hybrid inverters — 175 kW of conversion capacity — and five 60 kWh battery cabinets, 300 kWh in total. The hybrid inverters manage PV production, battery charging and grid supply together, so solar is consumed on site as it is generated and the surplus is stored rather than exported.

Stored energy covers the evening peak and keeps essential campus circuits running when the grid drops. Sizing the inverters in seven units also spreads conversion across the buildings instead of concentrating it in one plant room.

ParameterSpecification
System capacity175 kW hybrid inverters, 300 kWh battery storage
Core productsThree-phase hybrid inverters, 60 kWh battery cabinets
Device list7 × 25 kW hybrid inverters, 5 × 60 kWh battery cabinets
Operation modeGrid-tied self-consumption with backup capability
Key functionsSolar self-consumption, peak shaving, backup power
What the manufacturer reports

The Benefits as Claimed on the Source Page

  • Lower daytime energy costs — solar covers campus load while the sun is up.
  • Evening cover from storage — 300 kWh carries classes and events after sunset.
  • Backup for teaching — essential circuits stay powered during grid outages.
  • Reduced peak demand — storage trims the site's maximum draw from the grid.
  • Distributed conversion — seven inverters spread the plant across buildings.
If it were an H project

What Would Change With a 37.5–60 kW Cabinet

The H cabinet combines the inverter, battery and transfer switch in one enclosure, which suits a campus that wants one plant room per building rather than a cabinet plus separate inverters.

  • Storage count: 300 kWh is roughly three H100 cabinets.
  • Conversion: 175 kW of hybrid inverters would become 3–5 H cabinets (112–300 kW of conversion), depending on how loads are split across buildings.
  • Backup: each cabinet's transfer switch covers the essential loads wired to its backup port — the same 'essential circuits only' rule as here.
  • Sizing input: the essential-load list and the evening profile, not the roof area.
FAQ

Questions about these projects

Is this a LuminBlock H installation?

No. It uses seven 25 kW three-phase hybrid inverters and five 60 kWh battery cabinets. The H cabinet integrates conversion, storage and transfer in one unit; the campus project distributed them across buildings.

Where do these figures come from?

From the manufacturer's published account of this deployment. They are the manufacturer's figures, not measurements we took, and every number on this page is attributed to them. The page is self-contained; if you want the original document, ask and we will send it with the quote.

Can an H cabinet cover a whole campus?

Not one cabinet. Each H unit is 37.5–60 kW with 80–120 kWh, so a campus of this size needs several, usually one per building or per switchboard. The backup port covers the essential loads wired to that cabinet, not the entire site.