CabESSLuminBlock H · C&I all-in-one hybrid ESS
Home / Hybrid Energy Storage System for Commercial Sites
DC-coupled PV · 5 MPPT · 1,100 V

Hybrid Energy Storage System for Commercial Sites

You have panels already, or a quote for them, and you want the battery to store what the roof makes.

On the LuminBlock H the array, the battery and the grid meet on one converter, and the generator integrates with the same unit.

5 MPPT inputs1,100 V PV maximum200% PV oversizing88% round-trip
DEFINITION

Hybrid Means One Converter for the Array, the Battery and the Grid

A hybrid energy storage system connects PV, a battery and the grid through one bidirectional converter. The array charges the battery on DC, the battery discharges to the site on AC, and the midday surplus is stored rather than exported.

PV INPUT

Five MPPTs for a Roof That Faces Four Ways

Five trackers let five string groups run at their own voltage, which matters on a roof with east, west and shaded faces. Maximum input is 1,100 V.

The full-power window runs 225 to 850 V on the 37.5 and 40 kW units. It runs 270 to 850 V on 49.9 and 50 kW, and 320 to 850 V on the 60 kW unit.

OVERSIZING

200% PV Works Because the Battery Takes the Middle of the Day

PV input is rated at twice the inverter output. The 37.5 kW cabinet takes 75 kWp, the 40 kW takes 80 kWp. The 50 kW and 60 kW take 100 and 120 kWp. A roof making 120 kW at noon does not need a 120 kW inverter with 108 kWh of cells waiting.

Oversizing is a DC ratio. The AC connection still follows the inverter rating and the operator's export limit.

EFFICIENCY

What the Conversions Cost in Kilowatt Hours

Inverter efficiency is 98.4% at maximum and 98.0% on the European figure. Round-trip efficiency is 88% from DC to DC through the battery, the number to use for grid energy into 108 kWh.

On a DC-coupled set the array charges without an AC conversion in between.

EXISTING PV

Panels You Already Own Can Stay on Their Inverter

An existing array need not be rewired. It keeps its own inverter while new strings land on the cabinet's DC inputs, and both paths feed one battery.

Moving the old strings across is the other option. It removes a conversion stage and lets the battery absorb their surplus.

GENERATOR

The Generator Runs Alongside the Battery

Grid and generator integration run through the same converter, so a site can keep its diesel set and put the cabinet beside it. The battery covers the steps the set does not like, and the set runs at the load it prefers.

Sizing starts from the generator's minimum stable load and the largest step it accepts. Certificates are CB IEC 62619, CB IEC 63056 and CEI 0-21; UL 9540 is not held.

FAQ

Questions about hybrid energy storage system for commercial

Can I add this to an existing PV system?

Yes. The old array keeps its inverter while new strings land on the five MPPT inputs, up to 1,100 V. Moving the old strings across is a design choice: it removes a conversion stage and retires an inverter you own.

Does oversizing the array mean clipping?

Sometimes, and that is expected. PV input is rated at twice the inverter output. A 120 kWp roof on a 60 kW cabinet clips when the battery is full and the load is low. The extra panels earn their money in the hours the battery absorbs them.

How is this different from an off-grid inverter?

An off-grid inverter runs a site with no grid reference. This cabinet runs in parallel with the grid and imports and exports within the operator's limits. It switches to backup in 10 ms when the grid drops. It supplies the board it feeds.

What happens on a cloudy day?

The cabinet charges from the grid at cheap hours and discharges at peak, so peak control does not depend on the weather. Generation is whatever the roof makes that day, and sizing comes from the load profile. A quiet week changes the bill.

The String Layout Sets the DC Ratio.

Start with the form. Our sales team asks for the roof layout, module datasheet and a year of bills. You get the DC ratio, the MPPT split and the hours the array clips.