Ninety Kilowatt Hours Is the Number to Plan With
A 100 kWh cabinet gives 90 kWh of usable storage at 90% depth of discharge, held in five packs. It suits a site using 800 to 1,400 kWh a day whose peak sits between 40 and 60 kW for a few hours.
The other ten are the reserve the battery management system keeps.
Five Packs, Twenty Cells Each, One Bus
Each pack is 1P20S of 314 Ah LFP cells. Five sit on one bus behind a single BMS, in the same enclosure and pad as the 80 kWh unit.
Performance is rated at 6,500 cycles or ten years to 70% state of health at 25 °C, 0.5P and 90% depth of discharge.
The Two Models Differ at the Grid Connection
| Model | Output | Apparent power | AC current | PV input |
|---|---|---|---|---|
| BES-H49.9X100 | 49.9 kW | 49.9 kVA | 75.6 A | 99.8 kWp |
| BES-H50X100 | 50 kW | 55 kVA | 75.8 / 83.4 A | 100 kWp |
The H50X100 carries 5.1 kVA more apparent power and a higher output current, which matters on a board with motors or single-phase imbalance.
What Ninety Kilowatt Hours Flattens
A 40 to 60 kW peak held for two hours takes 80 to 120 kWh. A 90 kWh unit covers most of it and clips the rest. The demand charge falls to the remaining peak.
For steps inside the rating, the cabinet holds 150% for 10 seconds, which covers compressor starts and lift surges without tripping.
Why Some Sites Stop Here and Others Take 120 kWh
The footprint is identical across the range, so the reason to step up is weight and hours. The 120 kWh unit weighs 1,303 kg against 1,165 kg.
Sites with cold rooms, a second shift or a transformer near its rating usually find the 120 kWh unit earns the difference.
The Cabinet Is Complete, the Cable Route Is Yours
The cabinet arrives with five packs, the BMS, the hybrid inverter, aerosol fire suppression and cooling, at 30% state of charge or less. Documentation is released within 15 days of signature.
The pad, the cable trench and the earthing are yours. Certificates are CB IEC 62619, CB IEC 63056 and CEI 0-21, and UL 9540 is not held. Warranty runs 5 years on pack, inverter and cooling.
Questions about 100 kwh battery storage system
Which of the two models should I choose?
Start from the board. If the load is mostly resistive and the power factor is close to one, the H49.9X100 fits and connects at 49.9 kVA. If motors, welders or a single-phase imbalance are on the board, take the H50X100 for its 55 kVA and 83.4 A output.
Can it cover the whole site in a power cut?
Only the board it feeds. Transfer takes 10 ms and the cabinet holds 150% of rating for 10 seconds, with 22 kW per phase available for single-phase loads. Covering every circuit means a bigger cabinet and a changeover on the main board, and that is a design decision.
How long does commissioning take?
The pad has to cure before delivery, so the civil work sets the schedule. On the day, the cabinet is lifted onto the pad, the AC cable is terminated and the earth is connected. The site electrician witnesses the tests. The documentation pack is released within 15 days of signature.
What does the warranty cover?
Five years on the pack, the inverter and the cooling, and two years on the fire suppression. It starts 60 months from installation or 66 months from factory shipment, whichever comes first. An extension takes the cover to ten years, and spares are held in the EU, South Africa, Pakistan and Brazil.
A Month of Bills Gets You the Model and the kVA.
Start with the form. Our sales team asks for the half-hourly data and the board schedule. You get the model, the peak it covers and the hours it runs.