All-in-One Means the Site Connects One Cable
An all-in-one battery storage system puts the battery, the hybrid inverter, the transfer switch and the energy management system in one cabinet. The site brings one AC cable and one earth, where a split system needs three or four boxes coordinated on site.
What Sits Behind the Door
The cabinet carries 6 packs of 314 Ah LFP cells and a hybrid inverter rated 98.4% at peak. A static transfer switch changes over in 10 ms, and an EMS runs the dispatch modes.
A Split System Keeps a Cable Between the Parts
In a split build the battery cabinet and the PCS stand apart, linked by DC cabling at high current. The transfer switch and the controller are separate boxes with their own supplies and their own suppliers.
That is fine when one firm designs and installs the whole set. It costs time when the site holds four warranties and calls two numbers for one fault.
Three Things Change Before the Cabinet Arrives
- One pad instead of a plant room and a cabinet plinth.
- One cable run from the board, not a DC link between parts.
- One commissioning witness instead of a sequence of vendors.
The civil scope shrinks with the interfaces. A pad, a trench and an earth connection remain yours whatever the arrangement.
Where the Split Arrangement Still Wins
Retrofit is the clearest case. A site that already owns a PCS and a switchgear lineup adds battery capacity without replacing equipment that works.
Very large projects split too, because a 2 MW system is a set of cabinets and a central controller rather than one enclosure.
What You Give Up for the Single Box
Maintenance is one window for the whole cabinet, so a service visit touches the inverter and the packs together. Capacity also grows in cabinet-sized steps, from 80 to 120 kWh, rather than in the increments a separate PCS might allow.
Certificates are CB IEC 62619, CB IEC 63056 and CEI 0-21. UL 9540 and NFPA 855 are not held. Warranty is 5 years on pack, inverter and cooling and 2 years on fire suppression. It starts 60 months from installation or 66 from factory shipment, extendable to 10.
Questions about All-in-One battery storage system
Is all-in-one cheaper than split?
Fewer interfaces means less DC cabling, one pad and one commissioning visit, and those are the lines where the difference shows. We quote both arrangements on the same load profile. The answer moves with the distance between the parts and the state of the existing switchgear.
Can I add capacity later?
Yes. Up to ten cabinets run in parallel for 600 kW and 4,800 kWh, and DC expansion allows four on one battery bus. A site that starts with one unit adds another when the load grows, and the controllers balance the group without replacing the first cabinet.
What happens when one part fails?
The cabinet reports the fault through the EMS and the site keeps its grid supply, with backup unavailable until the part is replaced. Spares are held in the EU, South Africa, Pakistan and Brazil. A split system can keep the battery running while the PCS is serviced, and that is a real trade.
Does it need a plant room?
No. The cabinet is IP55 with an IP66 inverter and stands outdoors on a pad, so a plant room is optional. It is 1349 by 2100 by 990 mm and weighs between 1,025 and 1,303 kg depending on capacity. The pad takes that load plus lifting clearance.
Does an all-in-one cabinet use lithium battery storage?
Yes. The packs are LFP (lithium iron phosphate) at 314 Ah, four, five or six per cabinet depending on the energy rating. LFP is chosen for cycle life and thermal stability rather than for energy density.
Is an all-in-one cabinet lithium ion or lithium iron phosphate?
Lithium iron phosphate (LFP). The distinction matters: LFP battery storage trades a little energy density for thermal stability and cycle life, which is the right trade for a cabinet sitting outdoors on a commercial site.
Is lithium iron phosphate the same as lithium ion battery storage?
LFP is one lithium ion battery storage chemistry. It gives up some energy density for thermal stability and cycle life, which is why a lithium battery storage system in an outdoor cabinet usually uses it: 314 Ah cells, 6,500 cycles to 70% state of health.
Is lithium iron phosphate battery storage the same as LFP?
Yes. Lithium iron phosphate battery storage and LFP are the same chemistry. In this cabinet it is 314 Ah cells in a 1P20S string, four to six packs depending on the model, with 90% usable depth of discharge.
The Board Drawing Puts Both Arrangements on One Price Sheet.
Start with the form. Our sales team asks for the single-line diagram and the load profile. You get the all-in-one scope beside the split one, with the civil lines separated.