What Has to Be on Every Quote Before You Compare It?
A quote should name the cabinet model, the usable energy in kWh and the power in kW. It should also list everything inside the enclosure and everything the site has to provide. Without those five lines you are comparing two descriptions rather than two offers.
Model codes carry the rating. BES-H50X100 is 50 kW and 100 kWh with 90 kWh usable; BES-H60X120 is 60 kW and 120 kWh with 108 kWh usable. A quote that gives only the nameplate energy is quoting a bigger number than the site can cycle.
The inclusion list should read like a packing list: hybrid inverter, six battery packs, BMS, aerosol fire suppression, cooling unit. Civil works and external cabling are outside that list, and every serious supplier says so in writing.
Which Line Usually Hides the Difference?
Freight and lifting. One quote lands the cabinet on the pad, the other lands it at the gate. Weight runs from 1,025 to 1,303 kg and the container has to be unloaded with equipment the site may not own. That single line can move further than any equipment choice.
| Line | What to check | Typical mismatch |
|---|---|---|
| Cabinet scope | Which model code, which usable kWh | Nameplate vs usable energy |
| Inverter | Included, or supplied by others | One quote is cabinet only |
| Transfer switch | Inside the cabinet or a separate panel | Adds a box and a cable run |
| Freight and lifting | Delivered and set, or kerbside | Site rents a crane later |
| Commissioning | Witness test included, or not | Site pays a second visit |
| Warranty start | Installation date or shipment date | Up to six months apart |
| Documentation | Datasheets and test reports | Arrives after the first test |
| Spares | Regional stock or factory order | Different downtime |
How Do You Normalise Two Quotes?
Rewrite both into one table with the same rows, then strike out anything that appears in only one document. What remains is the part that can honestly be compared. The sequence below takes about an hour per quote and settles most of the argument.
- Fix the energy basis Convert every offer to usable kWh at 90% depth of discharge.
- Fix the power basis Rated kW, then the 10-second overload figure, then the maximum current in amps.
- Fix the boundary Mark where the supplier's responsibility stops: terminals, pad, or the load board.
- Fix the clock Warranty start, delivery lead time, documentation deadline.
- Name the gaps Every struck-out line becomes a question for the supplier, not an assumption.
The last step is the one buyers skip. A gap left unnamed does not disappear. It lands on the site's own budget later.
Which Assumptions Get Overstated?
Four assumptions do most of the work in a savings model, and all four are supplied by the person who wants the order. Ask for the source of each one before you accept the conclusion built on top of it.
- Peak duration. A model that assumes a two-hour peak needs 108 kWh usable; a real ninety-minute peak needs 60 kWh.
- Cycles per day. One cycle against two changes the lifetime arithmetic by half.
- Site temperature. The performance warranty is written at 25 °C, and a plant room above that is a different project.
- State of charge on arrival. Cabinets ship at 30%, so the first charge is a scheduled task, not an instant full battery.
None of these is dishonest on its own. Together they turn a modest case into an attractive one, and the site carries the difference for ten years.
What Do You Ask Before Signing?
Ask for the documents rather than the assurances. A supplier who holds CB IEC 62619:2022 and CB IEC 63056 can send the certificates the same day. One that holds CEI 0-21 can show the Italian grid code approval. Both are checkable.
Then ask the four questions that separate a project from a shipment. Who witnesses commissioning? Which regional spare stock covers this site? What is the exact wording of the warranty start? What happens to the parallel limit when the site grows from one cabinet to ten?
The parallel answer is worth having in writing. Ten units give 600 kW and 4.8 MWh, and capacity has to stay consistent across them. A system sold as a single cabinet needs its control design checked before unit two arrives.
What If the Supplier Will Not Break Out the Scope?
Then you are not comparing quotes, you are choosing between two trust positions. Ask once in writing for a scope breakdown and a document list. A supplier that will not provide either is telling you something about the next ten years of service.
The same applies to a quote that cannot name its own model code or its usable energy. Those are the two facts the whole design rests on, and a proposal without them has not been engineered yet.
Questions about this article
Should I compare on nameplate or usable energy?
Usable. The cabinet is rated at 80, 100 or 120 kWh and usable energy is 72, 90 or 108 kWh at 90% depth of discharge. Two quotes that name different figures for the same model are describing different depth-of-discharge assumptions.
How long should the warranty clock be?
The published term is 60 months from installation or 66 months from factory shipment, whichever comes first, with a five-year extension available to a ten-year maximum. A quote that starts the clock at shipment can lose half a year before commissioning.
What documents should arrive with the cabinet?
Datasheets, the CB IEC 62619 and CB IEC 63056 certificates, the compliance reports the site's insurer asks for, and the commissioning record. The delivery pack lands within 15 days, which should be before the witness test.
Is a smaller scope usually behind a lower total?
Often, though not always. The reliable test is the boundary line: where the supplier's responsibility stops. Two quotes with the same boundary and the same usable energy are genuinely comparable, and everything else is negotiation.
Two Quotes, One Scope Sheet.
We rewrite the two documents into one table, mark where the boundaries differ and list the questions to send back. No obligation, and no numbers invented on your behalf.