What Happens in the 10 Millisecond Gap?
The cabinet's internal transfer switch moves the load from the grid to the inverter in under 10 ms. The inverter is already running and synchronized, so the load sees a brief dip rather than an outage. Everything downstream keeps its supply reference.
The dip is the whole event. A switch-mode power supply with a rectifier and a capacitor bank bridges it without the output moving. A contactor coil does not, because the coil releases as soon as the voltage falls away, and the motor behind it stops.
That is why the number is quoted in milliseconds rather than seconds. At ten milliseconds the question is which loads bridge a half cycle. At one second it would be which loads can restart on their own.
Which Loads Actually Notice?
The pattern is consistent across buildings. Equipment with a power supply in front of it rides through. Equipment whose control depends on a holding coil or a phase reference does not. That is where the restart cost sits. Read the list against your own floor.
| Load | Behaviour at 10 ms | What to plan |
|---|---|---|
| PLCs, HMIs, network gear | Rides through on the supply capacitors | Nothing extra |
| LED and electronic lighting | Holds, minor flicker | Nothing extra |
| Contactors and motor starters | Coil releases, motor drops | Restart sequence or a hold-in device |
| VFDs on pumps and fans | Usually trips on undervoltage | Ride-through setting or a controlled stop |
| Chillers and compressors | Compressor trips, restart timer starts | Staggered restart plan |
| Servers and medical equipment | May reboot, depends on the supply | Check the vendor tolerance |
Read your own list against the table. Most sites find two or three rows that matter and a long tail that does not, which is how a backup design gets its boundary.
How Is This Different From a UPS?
A double-conversion UPS carries the load continuously through its inverter, so there is no transfer event at all. The cabinet works differently. It sits on the grid and transfers when the grid fails. The 10 ms figure describes that transfer, not a continuous conversion.
For a plant room the distinction saves equipment and losses. There is no second conversion stage running all day, no battery string kept at float for years and no separate UPS room. What it gives up is the absolute zero-gap transfer a double-conversion UPS provides.
Where the load genuinely cannot see a half cycle, a UPS stays the right answer. Where the load can, the cabinet does the same job with one fewer conversion in the path.
What Else Has to Be True for the Number to Hold?
Four conditions decide whether a site sees the published figure. The load list has to fit the inverter. The site and the cabinet must share a neutral and earth reference. The protection settings must not trip first, and the battery must hold charge.
- Fit the load to the inverter 60 kW on the largest cabinet, with 150% for 10 seconds for motor starts.
- Check the single-phase share Single-phase backup is 22 kW per phase even with a balanced three-phase load.
- Match the earthing The cabinet and the site must share one reference, or the transfer creates a step the electronics read as a fault.
- Keep charge in the battery A cabinet held at 30% for a tariff reason has less window than the nameplate suggests.
The first two are design decisions. The last two are operating habits, and they are the ones that quietly turn a 10 ms promise into a 10-second outage.
How Do You Prove It on Site?
Open the incoming breaker with the load running and watch the log. A witness test is a planned event, not a surprise. The site agrees the load state, the cabinet records the transfer, and the PLC heartbeat tells you whether anything restarted.
Do it twice. Once with the steady load, and once with the largest motor starting. The second test is the one that exercises the 150% overload window and the ride-through of everything downstream.
Record the result in the commissioning file. A future maintenance visit can then compare like with like, and a warranty conversation starts from evidence rather than memory.
When Do You Need a UPS Instead?
You need a UPS when the load has no tolerance at all. The other cases are a datasheet that asks for an uninterrupted supply. Some equipment also holds state in volatile memory with no restart procedure on site. Those are UPS requirements and no transfer time satisfies them.
For everything else, the honest test is a stopwatch and a conversation with the maintenance team. Ask what happened the last time the site lost power and how long the restart took. That answer sets the requirement.
Questions about this article
Is 10 ms faster than a standard ATS?
Yes. A mechanical automatic transfer switch moves in hundreds of milliseconds, sometimes seconds, because it has to physically move contacts. The cabinet's static switch is electronic, which is where the millisecond figure comes from.
Will a 10 ms transfer keep my servers running?
Only if the server power supplies tolerate a half-cycle dip, which most do and some do not. Check the vendor specification rather than assuming, and put anything critical behind its own UPS.
Can the transfer happen with a generator running?
Yes. The generator connects to an input inside the cabinet, and the same internal switch manages the sequence. The load lands on battery first and moves to the generator once it is up.
What is the overload limit during a transfer?
150% of rated power for 10 seconds. A motor start that lands inside that window is carried; one that exceeds it trips the cabinet and the load restarts.
Tell Us Which Load Cannot Blink.
Start with the form. Our sales team asks for the load list and the restart story from the last outage. We will mark which rows the cabinet carries and which ones need a UPS behind them.