Delivery and Container Loading

A battery cabinet is not a box you can stack anywhere. Loading is planned around weight, state of charge and the transport documents, and the plan is set before the container is booked.

The packing figures, the scope that ships with each unit, and the paperwork that arrives after signature.

8 cabinets in a 20GP16 cabinets in a 40GP≤30% state of charge at shipment15 days for the document pack
SCOPE

What Sits in the Cabinet on Arrival

Cabinets ship assembled and factory-tested, with UN38.3 reports and a shipping state of charge at or below 30%. A 20-foot container takes eight cabinets and a 40-foot takes sixteen. Documents follow within 15 days of signing; extra battery cabinets, iEMS and CTs are shipped as separate line items.

Each unit ships as a complete cabinet: hybrid inverter, six battery packs, BMS, aerosol fire suppression and the cooling unit, already wired and tested.

What is not in the price is the work around it. Civil works, the foundation, external cabling, breakers and the changeover switch are site side, and they appear as separate lines on the quote.

The cabinet itself measures 1349 by 2100 by 990 mm and weighs 1,025 to 1,303 kg depending on the model.

LOADING

Eight Units in a 20GP, Sixteen in a 40GP

ContainerCabinet unitsSpace usedWeight used
20GP887%43%
40GP1686%87%

Battery cabinets load differently. A 20GP takes 10 and a 40GP takes 21, and the 40GP is at 99% of its weight limit, so nothing else goes in that box.

Once a project passes 480 kWh the shipment is a mix of main units and battery cabinets, and the loading plan is built per order rather than from a standard figure.

TRANSPORT

Cabinets Travel at Thirty Percent Charge

Cells leave the factory at or below 30% state of charge, which is the transport condition the UN38.3 report covers. Both the pack and the finished unit carry their own report.

Sea freight is routine. Air freight needs the carrier's dangerous goods certificate on top of the report, and that is arranged case by case.

DOCUMENTS

The Document Pack Lands Within Fifteen Days

Within 15 days of signature: the nameplate drawing, user manual, installation manual, conformity certificate and the certification reports. Factory acceptance test data travels with the unit.

Ask for the drawing first. It is the document your electrical contractor needs to plan the cable route and the breaker sizes, and it is the one that unblocks site work.

LEAD TIME

Lead Time Is Confirmed, Not Published

We do not publish a lead time, because it depends on the model mix, the destination and the production slot. Your order confirmation names the planning department contact who owns the date.

Ask for that date in writing at order stage. A published average is not a delivery commitment, and treating it as one is how site schedules slip.

FAQ

Questions about delivery and container loading

Can I mix models in one container?

Yes, and it is common above 480 kWh. The loading plan is rebuilt for that order because the weight balance changes.

Who arranges freight?

Either side. If we quote freight it appears as its own line, with insurance and hoisting named separately.

Is hoisting included?

Not by default. A cabinet weighs over a tonne, so crane or forklift arrangement belongs on the site works line.

What if the site is not ready?

Store the cabinet dry, keep it above freezing and top the charge to about 50% every six months.

What ships with the cabinet, and what is bought separately?

The cabinet ships assembled, with the DTSU208 meter and the handover documents. Battery cabinets, the iEMS controller and the CTs are separate items and appear as their own lines in the quote, so you can see exactly what is in the box and what is on site.

Get the Loading Plan With the Quote

Tell us the destination port and the model mix. The reply carries the container count, the weight per box and the document list.