A Charger, a Solar Array and a Weak Connection
The site pairs a ground-mounted array with a fast charging point. Charging demand peaks in the evening, after PV output has fallen; cloud cover moves generation across the working day; and the PV, storage and charging had to be dispatched as one plant rather than three separate assets.
- Load: EV charging, with an evening peak.
- Generation: ground-mounted PV, variable through the day.
- Constraint: available grid capacity, not the charger's rating.
A 240 kW Load on a Connection That Cannot Carry It
A 240 kW charger draws more than the site's grid connection can supply on its own. Without storage, the charger would either be throttled or the connection would need rebuilding. PV adds a second variable: generation peaks at midday, charging peaks in the evening, and export earns less than self-consumption.
The plant had to serve the charger from its own generation and storage, and stay inside the grid connection while doing it.
Three Assets, One Dispatch Layer
Two 110 kW three-phase grid-tied inverters take the array to 220 kW. Two 125 kW / 261 kWh cabinets add 522 kWh of buffer. One 240 kW DC fast charger delivers solar or stored energy to vehicles.
In off-grid mode the plant serves the charger from solar whenever generation is sufficient; otherwise the batteries make up the difference, and without sunlight the charger is powered by storage alone. An integrated energy management system controls PV, storage and charging together, keeping dispatch aligned with what the site is producing.
| Parameter | Specification |
|---|---|
| System | 250 kW plant: 2 × 110 kW inverters (220 kW), 522 kWh storage, 240 kW DC charging |
| Core products | Three-phase grid-tied inverters, LuminBlock BESS, DC fast charger |
| Device list | 2 × 110 kW inverters, 2 × 125 kW / 261 kWh cabinets, 1 × 240 kW charger |
| Operation mode | Off-grid capable, PV-priority charging |
| Key functions | Solar self-consumption, storage buffering, EV fast charging, IEMS dispatch |
The Benefits as Claimed on the Source Page
- Charging without grid upgrades — the plant supplies the charger, not the local grid.
- Evening charging from storage — 522 kWh carries the charger after sunset.
- Solar used where it is produced — generation goes to vehicles first, not to export.
- One dispatch layer — the energy management system coordinates PV, storage and charging in real time.
- Resilient operation — the site can run on its own generation when the grid is unavailable.
What Would Change With a 37.5–60 kW Cabinet
The H cabinet is an AC-coupled unit: it does not replace the PV inverters. A site like this would keep its solar inverters, add H cabinets for the buffer, and manage the charger through a controller that respects the grid connection.
- Discharge capacity: 60 kW per cabinet, so a 240 kW charger cannot be carried by one cabinet; the design either uses several in parallel or manages the charger's output.
- Storage: 522 kWh is roughly five H100 cabinets — inside the ten-unit system limit.
- Backup: the H cabinet includes a transfer switch and a diesel interface, which this project did not need at the charger.
- Sizing input: the charging session profile and the grid connection, not the PV array size.
Questions about these projects
Is this a LuminBlock H installation?
No. Storage is two LuminBlock 125 kW / 261 kWh cabinets, with separate PV inverters and a separate 240 kW charger. The H cabinet is a single AC-coupled unit at 37.5–60 kW and would be deployed differently on the same site.
Where do these figures come from?
From the manufacturer's published account of this deployment. They are the manufacturer's figures, not measurements we took, and every number on this page is attributed to them. The page is self-contained; if you want the original document, ask and we will send it with the quote.
Could an H cabinet run a charger off-grid?
Partly. The H cabinet can form a backup supply for essential circuits, but a 240 kW charger is far above a single cabinet's 60 kW discharge. Off-grid charging at that power needs several cabinets in parallel plus a charger that can follow the available output.