CabESSLuminBlock H · C&I all-in-one hybrid ESS
Home / Projects / 208 kW of Charging on an Existing Depot Supply
Project · Romania · logistics depot

208 kW of Charging on an Existing Depot Supply

A courier depot must turn vans around overnight and keep sorting lines running, so charging has to fit around fixed delivery windows rather than extend them. In Rudeni, Ilfov County, a logistics warehouse installed four 22 kW AC stations and one 120 kW DC fast charger, for 208 kW of installed charging capacity inside the depot's existing power envelope.

Fleet electrification in Romania is moving faster than depot power capacity. The project's answer was load sharing, not a new connection. This project uses a different product. See how an LuminBlock H project differs.

208 kW installed charging4 × 22 kW AC120 kW DC fast chargerExisting depot supply
The site

Vans Overnight, Sorting Lines All Day

Vans return after dusk with tight morning departure windows. Overnight charging loads compete with the sorting line for the same supply. Some vehicles need a slow overnight charge; others need to be back in service within a driver break.

  • Load: mixed duty cycles, overnight dwell plus daytime top-ups.
  • Constraint: limited depot power capacity.
  • Requirement: every van full before the morning dispatch window.
The problem in the bill

More Vans Than the Connection Can Charge at Once

Electrifying the fleet without rebuilding the depot's electrical infrastructure means the charger layout has to share the supply that already exists. A wall of simultaneous AC sessions would trip the depot; a single DC charger alone would not return vehicles fast enough during the day.

The design question was not 'how fast can we charge' but 'how many vans can leave full, on the power we already have'.

What was built

AC for the Night Shift, DC for the Day

Four BUSH 22 kW AC stations cover the overnight parking bays, and one MotionFast 120 kW DC charger handles daytime opportunity charging — 88 kW across the AC stations and 120 kW on the DC unit, 208 kW in total.

Load sharing between the two charging types keeps the site inside its grid connection. One access-control platform covers both, with reporting.

ParameterSpecification
System capacity208 kW total charging capacity (4 × 22 kW AC + 1 × 120 kW DC)
Core productsBUSH AC charger, MotionFast DC charger
Device list4 × 22 kW AC charging stations + 1 × 120 kW DC fast charger
Operation modeOvernight AC charging, daytime DC opportunity charging
Local resourceLogistics warehouse parking bays, Rudeni, Ilfov County
What the manufacturer reports

The Benefits as Claimed on the Source Page

  • Fleet readiness — every van back in service, fully charged, before the morning dispatch window.
  • Fast turnaround — a vehicle recharged within a driver break at 120 kW DC.
  • Grid-friendly load — the depot's existing capacity shared between overnight and daytime charging.
  • One platform — AC and DC sessions managed through the same access control and reporting.
  • Lower running costs — off-peak electricity from the depot supply replaces diesel refuelling.
Where a cabinet would fit

What an H Cabinet Would Add to This Depot

This project has no battery. Its constraint was peak load sharing, and scheduling solved it. A depot that needs more simultaneous sessions, a higher evening peak, or backup for the sorting line would add storage instead of another charger.

  • Buffer: an H cabinet beside the switchboard can absorb the charging peak and release it later, which is the same logic as the Poland project at a smaller scale.
  • Backup: the H cabinet's transfer switch can hold essential circuits — lighting, IT, the sortation controller — through a grid outage.
  • Limit: one cabinet discharges 60 kW, so it supports roughly four 22 kW sessions, or one DC session at reduced power.
  • Sizing input: the charging session profile and the depot's peak, not the number of vans.
FAQ

Questions about these projects

Is this a LuminBlock H installation?

No. It is a charging project — four AC stations and one DC charger, no battery. We include it because fleet charging is one of the most common reasons a C&I site starts looking at storage, and this project shows the constraint clearly.

Where do these figures come from?

From the manufacturer's published account of this deployment. They are the manufacturer's figures, not measurements we took, and every number on this page is attributed to them. The page is self-contained; if you want the original document, ask and we will send it with the quote.

Would storage have replaced the charger or the AC stations?

Neither. Storage changes when the depot draws power, not how vehicles connect. A cabinet buffers the peak so more sessions can run inside the same connection; it does not replace the chargers.

Request a Quote for a Site Like This

Seven fields, no attachments. We aim to reply within two working days of a complete enquiry, with the scope broken out and every assumption written down. If a cabinet does not make sense for your site, we say so.