What Actually Sits Inside an All-in-One Cabinet?
The cabinet carries the hybrid inverter, six battery packs, the battery management system, aerosol fire suppression and the cooling unit. All of it sits in one 1349 by 2100 by 990 mm enclosure. The transfer switch and the generator interface are inside as well, so the site supplies a grid connection and a load connection.
Everything that has to talk to everything else is wired at the factory. The string-level shutdown, the smoke and temperature sensors, the emergency stop and the AFCI sit on the same internal bus. The enclosure leaves with one set of terminals rather than three.
That is the real difference. An all-in-one system is a product with a drawing. A split system is a design with a bill of materials.
What Changes in the Installation Programme?
One delivery, one lift and one commissioning window replace three of each. The sequence below is what a single-cabinet install looks like. It is also the part a split system breaks into parallel tracks that all finish on the same day.
- Pad and containment A flat pad sized for 1,349 by 2,100 mm, with the C4 coating rated for the site's air.
- Set the cabinet 1,025 to 1,303 kg depending on nameplate, lifted onto the pad and anchored.
- Grid and load cables One AC run in and one out, three-phase plus neutral and earth at 380, 400 or 415 V.
- PV strings where used Up to five MPPT inputs, 1,100 V maximum, 150 to 1,000 V tracking.
- Commission The unit ships at 30% state of charge, so the first charge is planned rather than assumed.
A split system spreads those five steps across battery, inverter and switchgear suppliers. The site work is not harder, and the number of interfaces that must be witnessed together is larger.
What Changes in the Maintenance Routine?
An air-cooled cabinet has no coolant loop, no pump and no glycol to check, so the routine is filters, fans, terminals and a state-of-health read. A pack change is a planned task for a trained crew, and the cabinet does not have to leave the site for it.
The warranty clock is the same either way. Five years on packs, inverter and cooling, two on fire suppression, extendable by five years to a ten-year maximum. A split system adds a second supplier to that conversation and a second set of terms.
Spares availability matters more than the architecture. Regional stock covers the EU, South Africa, Pakistan and Brazil, and a single-supplier cabinet means one part number to chase instead of three.
Where Does a Split System Still Win?
Three site conditions favour separate equipment. A battery room that already exists and only needs DC capacity added. A very long distance between the battery position and the inverter position. And a site that already owns a compatible inverter it intends to keep.
Each of those is a real constraint rather than a preference. On a new pad with a normal cable run, the split build buys interface risk and coordination hours. In exchange it offers granularity the site may never use.
There is also a servicing argument. A split system lets one box be replaced without touching the others. An all-in-one cabinet trades that for a single warranty holder and a single commissioning event.
Which Question Decides It?
Ask who will own the interfaces. If the answer is one supplier, the all-in-one cabinet keeps that answer true after handover. If the site already has three suppliers it trusts and a maintenance team that likes the arrangement, a split build fits the way they work.
| Question | All-in-one cabinet | Split system |
|---|---|---|
| Who commissions the DC side? | The cabinet supplier | The battery supplier |
| How many delivery dates? | One | One per box |
| Where is the transfer switch? | Inside the cabinet | A separate panel |
| Pack replacement | Trained crew, on site | Depends on the battery supplier |
| Warranty holders | One | Two or more |
What Has to Be in the Quote Either Way?
The cabinet price covers the enclosure with its hybrid inverter, six battery packs, BMS, aerosol suppression and cooling unit. Civil works and external cabling sit outside it. Any quote that does not say so is leaving a gap for the site to fill later.
Documentation is the other line to check. The delivery pack lands within 15 days, which is what the installer needs before the first witness test rather than after it.
Questions about this article
Does an all-in-one cabinet need a separate switchgear panel?
Not for the transfer function. The switch sits inside the cabinet with a 10 ms transfer to backup. The site still provides its own distribution board for the loads it wants to keep running.
Is a split system easier to expand?
Not necessarily. A single cabinet system takes up to three additional battery cabinets for 480 kWh in total, and up to ten units parallel to 600 kW. Expansion is a control and cabling exercise in both architectures.
Which one is easier to maintain?
The all-in-one cabinet, on a normal site. There is no coolant loop to service, one warranty holder and one set of terminals. A split system adds suppliers to every maintenance conversation.
Can the cabinet go outdoors?
Yes. The cabinet is IP55 and the inverter section is IP66, with C4 corrosion protection as standard and C5 as an option for coastal or aggressive air.